Changxing Island dock engineering
Project November 15th, 2009
Pic-1
Pic-2
Pic-3
Contractor: No3 Engineering Company Ltd. Of CCCC First Harbor Engineering Company Ltd.
Date: Oct. 2007
Geological conditions: Soft soil, Sludge, Fine sand, cobblestone
Quanlity: sheet pile 3980tons
Overview:Major dock project in Liaoning province!! Many kinds of lengths, the maximum up to 22m. Asphalt is used as waterproof material during the construction!
The whole project can save money than hot rolled sheet pile with material savings.