Jingjiang dock engineering

Project No Comments »

Pic-1

 
Pic-2

pIC-3

Contractor: Shanghai water engineering construction Co.,Ltd
Date: Jul. 2008
Geological conditions: Along the Changjiang River
Quantity: SHEET PILE 1600 tons
Oveview: Major project in Jiangsu province, The length all being over 10m!!
Cost, material saved, money saved nearly 5million RMB!!

Changxing Island dock engineering

Project No Comments »

Pic-1

Pic-2

Pic-3

Contractor: No3 Engineering Company Ltd. Of CCCC First Harbor Engineering Company Ltd.
Date: Oct. 2007
Geological conditions: Soft soil, Sludge, Fine sand, cobblestone   
Quanlity: sheet pile 3980tons
Overview:Major dock project in Liaoning province!! Many kinds of lengths, the maximum up to 22m. Asphalt is used as waterproof material during the construction!
The whole project can save money than [...]

Maintenance of Suzhou River, Shanghai

Project No Comments »

             
 IMA.1
     
IMA.2

Contractor: Shanghai water engineering construction Investing Corporation
Sheet pile model: 650*540*10mm
Overview: Major project for the arrival of Shanghai World Expo!! The useful life up to 50years and the quantity exceed 3000tons, The length: 15m, 16m , 18m.
 

 

No.3 West Ring Way Close Project In Kunming

Project No Comments »

IMA.1

IMA.2
 
 

 
IMA.3

Builder:JIANGXI GEOLOGICAL ENGINEERING GENERAL COMPANY
Model: WRU12a(600*360*9mm)
Date: Year 2009

 

 

Tianjin Xingang Shipyard Engineering

Project No Comments »

Fig.1

Fig.2

Fig.3

Contractor: NO.1 Engineering Company Ltd. of CCCC First Harbor Engineering Company Ltd.
Model: 650*540*10mm WRU25
Place: Tianjin Xingang Shipyard
Geological conditions: Soft soil, Sludge, Clay